Saturday, March 9, 2013

Phase 6 body and paint

After finishing the Aluminium Roll cage, Bumpers and suspension, we bring her back to the body shop. started first with the fenders, we put the tires on to measure the width fit the tires just right. then the preparation for the paint, we choose a aluminium silver to match all the aluminium we put in it.  photo IMG_4577.jpg  photo IMG_4535-Copy.jpg  photo IMG_4661.jpg  photo IMG_4624.jpg  photo IMG_4654.jpg  photo IMG_4807.jpg photo IMG_4821.jpg  photo IMG_1065.jpg  photo IMG_1077.jpg

Saturday, April 21, 2012

PHASE 5

It's been a while since my last post. but the project stills runing, well, I mean walking since it been a little slow, has we are trying new way of doing things. Like the Aluminiun ROLL CAGE, BUMPERS, AND SEATS. Yeap! All that made of Aluminium.
After installing the body to the Denali Frame, the adaptations to fit all the components to the blazer wasn't easy. a lot of things where modified, THE GAS TANK AND PUMP, THE DASH, STEERING WHEEL COLUMN, THE TRANSFER CASE, RADIATORS, AIR FILTER, BATERY BASE, AND A LOT MORE.
Making the Aluminium roll cage was a real chellenge too, since it was the first time for Victor Martinez to do a job like this
in the picture above this one you can see the aluminium weldig, it takes 4 to 5 times to weld aluminium insted of steel.
The skidplate was made of a 1/4 thick aluminium sheet, and computer engraved.
The bumper should hold 4 Rally 4000 of 100W (I show them on the next post)
The seats were made of an aluminium frame as well, reaching an aprox. 5 kilos(11pounds) total weight each.
4 2.5 remote reservoir FOX SHOX will be installed, right now we just installed the rears, as the front suspension will be a little more complicated as I like hahaha.

Sunday, October 23, 2011

Phase 4.2

By this time the project it's taking form, so far so good it's 14 weeks to this point, all the new parts will be assembled this week, they've been waiting anxious in their respective boxes in a little dark room of the garage.

Phase 4.1

We are getting closer to our goal, this next week we'll start the engine and check that all components are working fine.

Sunday, October 2, 2011

Just painted!

The frame is painted and asembled. Lot Of Work is coming, and Of course more pics and updates ;)

Friday, September 30, 2011

Phase 3.3

We keep working on the BLENALI project this is the latest advance in the project, the frame it's been shortened modified and painted, ready to recieve the Blazer body, I keep updating as we move forward in the project.